How Long to Wait After Pouring a Concrete Slab Before Acid Staining?

By: Danny Lipford

Post to Twitter Post to Facebook  

On a new concrete slab, how long must you wait before you can acid stain it? -John

Hi John,

You should allow the concrete to cure thoroughly before staining or finishing, to allow any excess water in the slab to evaporate. The instructions with most acid stains (as well as concrete sealers and coatings) say to wait at least 28 days after pouring a slab before finishing it, with some recommending as long as 60 days. However, a lot depends on the consistency of the concrete and the weather conditions.

  • If the concrete mix was stiff without too much water in it, the temperature was over 65° F during and after the slab was poured, and there has been little rain; you may be able to stain it in as little as 18 days.
  • If the temperature was under 65° F, the concrete mix was soupy, or there’s been a lot of rain, I would wait 30-45 days before staining.

Good luck with your project,

Danny

Further Information

Tags: , , , , ,


Please Leave a Comment

We want to hear from you! In addition to posting comments on articles and videos, you can also send your comments and questions to us on our contact page or at (800) 946-4420. While we can't answer them all, we may use your question on our Homefront radio show, Today’s Homeowner TV show, or online at dannylipford.com.

Notify me of followup comments via e-mail. You can also subscribe without commenting.

Sign Up For Danny's Free Monthly
Newsletter
* indicates required
Summer and Winter Survival Guide
First Time Homeowner
Top 50 Homeowner Challenges