CONNECT AT:
How Long to Wait Before Staining a New Wood Deck?
Pressure treated wood often arrives still wet with preservative and needs time to dry before staining. Watch this video to find out how long you should wait before staining. ...More

dannylipford.com
home page
today's homeowner
full episodes
How To
Videos
thinking
green
around
the yard
simple
solutions
best new
products
ask
danny
top 50 homeowner
challenges
home
products

Related Videos


How to Choose a Grill: Ga...
How to Use Reclaimed Wood...
Fencing Options for Your ...
Tools for Sanding Wood Fl...
Maintaining a Wood Deck
Common Maintenance Projec...

70 Ask Danny Videos


   page  1 of  4    
Next Page

Post to Twitter Post to Facebook  

I want to stain my new treated lumber deck, but I’m told I have to wait several weeks. Is that true? -Gerald

Pressure treated wood decking is often delivered still wet with preservative. It needs time to dry out before finishing, so the stain will absorb into the wood.

How long you need to wait before staining will vary depending on:

  • The moisture content in the wood.
  • Whether the deck is in the sun or shade.
  • The climate and weather conditions in your area.

Depending on the wood and drying conditions, you should usually wait 4 to 8 weeks after installation before staining a deck.

Danny

Further Information



Please Leave a Comment

We want to hear from you! In addition to posting comments on articles and videos, you can also send your comments and questions to us on our contact page or at (800) 946-4420. While we can't answer them all, we may use your question on our Homefront radio show, Today’s Homeowner TV show, or online at dannylipford.com.

Notify me of followup comments via e-mail. You can also subscribe without commenting.

Gerald Asks: I want to stain my new treated lumber deck, but I’m told I have to wait several weeks. Is that true?

Danny Lipford: Whether you have an old deck or a brand new one, it’s important to regularly apply a stain or sealer, so that you can keep your deck looking as good as possible and lasting as long as it should. But with the new deck, the new wood needs a little time to allow the chemicals or the moisture in the wood to evaporate a little bit, so that it will receive the stain or sealer in the best way possible.

Now, a lot of factors play into that, whether or not the material was stored outside at the lumber yard, how long ago it was that they actually treated the wood, and whether your deck is out in the sun or in the shade. So, as a general rule, I would say, wait at least four weeks after your deck is built, or eight weeks if you’re in a real shady situation. That way, when you apply the stain or sealer, it’ll stay there.